Lakeside: Saturday 23 September we will have Lamb shank on the meny and will have open longer.
During week 5 the irrigation team completed the install of additional fore-green heads on the B-Loop and then proceeded to C-Loop on which works will continue through week 6.
Tee construction through week 5:-
A6 tee had drainage installed, USGA gravel layer and root-zone. (Timelapse video available in Watch section)
B1 tee base level graded, drainage installed, irrigation installed, USGA gravel layer installed and root-zone installed.
Initial works have started on B2/C1 dual white tee. This will continue through week 6.
During Saturday of week 5 marking out and preparation for the area that will be the turf nursery took place, construction of this will continue through week 6.